
Project started
December 2020,
See the CAD version here

In the last episode I made the connection box fort the speedo,
this will be hidden under a cover but still easily accesible.
Next I needed to connect the 2 tank halves at the top and bottom.
I machined the hose nipples for the top and made a little jig
thingy that mimicks the tankmounts on the frame to make sure they
would be welded exactly opposite eachother. Aad did the welding. |



I also added a fuelguage that will be visible through the bubble
when riding, maybe I will put a light behind that for better visibility. |


Before connecting the tanks at the bottom and relocating the
fueltap I started making new lower tank mounts that will hopefully
clean up that area. Normally they connect to a big ugly bracket
on the front downtubes, I cut that off already and will connect
the lower tankmounts to the countrybar of the frame |
 


 

 
|