Copyright WWW.DBBP.COM | updated 23-June-2003

 

 
 

All the welds on the fueltanks have been ground away and Fred has added the fillercaps. He also added two clamps that connect the tankhalves over the top frametube. The Shovelhead valvecovers have both been cut in halves and reshaped into 4 separate covers.

 
 

Taking advantage of the raised gearbox Fred constructed both exhaust pipes from stainless steel welding bends and pipe sections, keeping them close to the center of the bike so they won't interfere with the cornering ability of the bike. Finally Fred started building the rear part of the frame, the bike is looking better and better!

 

Thanks to Fred "Krugger" Bertrand
www.krugger.net

Previous