Copyright WWW.DBBP.COM | updated 17-August-2026


Project started October 2023,
adding more details to the forward controls and starting on the rear brakeline

 
 
 
 
We machined 2 old bolts to look like rivets for the footpegs, modified the shifter with a larger diameter tip, drilled the "rivets" for cotter pins and added small bronze washers to eliminate play on the footpegs. Then (re)textured and darkened the new and modified parts. Also added a return spring and end-stop on the clutch pedal.
 
 
 
 
 
 
We carefully bent the end of the brakeline, modified the top of the swingarm casting and shortened both chain tensioners for a more natural routing, the devil is in the details...
Previous