Project started October 2023,
After welding the brake pedal we drilled and reamed the hole to the correct size, always do this after welding because welding will distort the metal. We welded a steel bar on the front mounting bolt and reshaped it so it doubles as a mounting point for the brake pedal return spring.

 
 
 
 
 
 
Aad had painted the pipes by the way, looks good I think! The heads of the ugly mounting bolts for the master cylinder were welded up and reshaped to resemble the dome nuts on the knucklehead, much better!

 
 
 
 
We machined bronze bearings for the brake pedal and textured it before heat darkening.
All the bare metal parts were covered in Linseed oil to prevent rust, next week we will rebuild the master cylinder and start making the brake lines