Project started
October 2023,
| In this episode we continue with the frame |



| With the frame still in the jig we welded all the bits we could
reach such as seat tube, bottom horizontal tubes and where the
front downtubes connect with the neck |




| Getting the brazed connection between the front downtibes and
the neck was the trickiest part, as the sleeves were getting hotter
than the the tubes that were inside them. By taking the frame
out of the jig and positioning it with the neck down we finally
got a good connection. Apart from the neck most welds were done
with MIG to create the same look as the factory welds, but a bit
neater haha. |



| Next we will reconnect the seatpost to the bottom
horizontal tubes.. |
|