|
To make sure the bridge that was welded to the
swingarm would not fall off, Aad used a REALLY BIG welder to
build up material and then spent a lot of hours smoothing these
welds. The swingarm was mounted on a vertical milling machine
and the legs and pivot thingy were machined flat and perpendicular,
and the holes for the bearings and chain tensioners were added.
|