Copyright WWW.DBBP.COM | updated 22-11-2016

 
 
 
 
 




After several Fridays (pretty much the only day we can work on our own bikes..) the stainless steel handshifter and linkage are done! Next job will be replacing the steel brakepedal on the left side of the bike with a stainless version on the right side of the bike.

 
 
 
We had already been doing some work on the motor plates removing the ribs, now we had to move the brake pedal pivot from the left side to the right side of the bike. Actually we just made a new pivot point. It is slightly different because our version will have a bronze bushing. Aad finished the welding, next week a lot of filing and grinding to make both pieces look like castings again.

Previous