Copyright WWW.DBBP.COM | updated 12-July-2004

 

 
 

Aad machined 4 stepped aluminum rings to fit in the seatsprings while I sawed & filed & drilled the seat pivot. We strengthened the frametube we halved last week with some thick strips of steel and then it was time to grind and file everything smooth again. Real steel, no filler!

 
 



Previous